GZ to Shenzhen
previous
prev
next
next
The Yellow line. The GZ subway had two lines out of nine completed at the time of my visit. So beautiful compared to SEPTA. The construction required numerous tunneler machines, however it was only necessary to order one tunneler from Samsung. With one to completely take apart and look at it was very easy to copy aspects of the design and produce more tunnelers in China.
day 4
11 July 2005
GZ to Shenzhen